Prepared for: B.C. Ministry of Environment, Lands & Parks
Prepared by: Summit Environmental Consultants Ltd.
From the Introduction:
"The purpose of the interim report is [to] provide MELP staff with sufficient information to proceed with planning 1995 WRP activities in the Mission Creek watershed. Only those stream reaches and sites that were inspected in the field in the autumn of 1994 are described in detail."
See the Report [PDF]. Note: scanned copy of original document.